Google Cloud previews in-place migration of GKE clusters to Dataplane V2
Google Cloud has released a preview that lets eligible VPC-native GKE clusters move from Dataplane V1 to Dataplane V2 in place, without building a parallel cluster. Teams running production Google Kubernetes Engine clusters with stateful workloads are the main audience.
What to do now
On 19 November 2026 Google Cloud announced a preview of in-place migration for Google Kubernetes Engine (GKE). The feature moves eligible VPC-native clusters straight from GKE Dataplane V1 to GKE Dataplane V2 instead of requiring a new environment.
Until now, adopting Dataplane V2 on a production cluster usually meant standing up a parallel cluster and shifting workloads across. Google acknowledges that this was difficult for clusters carrying stateful applications and established IP allocations.
Dataplane V2 is built on eBPF and the open-source Cilium project, and it replaces iptables-based routing and kube-proxy. Packet handling uses eBPF maps inside the Linux kernel rather than linear iptables rule chains.
Google says the design supports clusters of up to 15,000 nodes with network policy enforcement, and up to 65,000 nodes with enforcement disabled, although that larger configuration requires recreating the cluster. Dataplane V2 is also the networking layer for GPU and Cloud TPU clusters and underpins features such as GKE managed DRANET for dynamic allocation of network devices.
The available material does not spell out the full eligibility criteria, the step-by-step procedure or when the feature will reach general availability. Because it is a preview, administrators should be cautious about using it on critical clusters until Google's documentation fills in those details.
What to do now
- Inventory GKE clusters still on Dataplane V1 and identify which are VPC-native, the only type covered by in-place migration.
- Read the GKE documentation for the exact eligibility requirements and preview limitations before attempting a migration.
- Run a trial migration on a non-production cluster that mirrors your network policies and stateful workloads.
- Schedule production migrations only after testing, with a maintenance window and rollback plan as general good practice.